Engineers 3rd Party for CTF Design phase
Al Fursan Recruitment
Abu Dhabi-United Arab Emirates
منذ 3 يوم
source : QuickJobsGulf

Overview of Project Al Dhafra Petroleum Operations Company Limited is a joint venture between ADNOC and KADOC established in late 2013 and assigned with Onshore and Offshore concession areas in Abu Dhabi One of these areas Area1 is located onshore in Abu Dhabi and currently includes four discovered fields namely Haliba Bu Qalla Riqueah and L1G The EPF will be in the Haliba field located about 150km South from Abu Dhabi The ongoing Haliba Full Field Development FFD EPC Project for the permanent facilities is under T A phase and in order to accelerate the First Oil target in Haliba field an Early Production Facility EPF will be installed to commence production from already drilled wells The EPF will be implemented to produce stabilized crude to ADCO export specification locally in Haliba using modular processing skids provided by Schlumberger The stabilized crude oil produced at the EPF will be transported from Haliba Field to tiein to a nearby ADCO facility Asab CDS Stabilised crude will be transported to the ASABCDS facility via either oil trucking or by pipeline Associated gas may either be flared on site or will be routed by pipeline to ASABCDS The bid will make provisions for all the above options EPF operations will cease after 18 months or if required to operate for a longer period will be instructed by Al Dhafra Upon completion of EPF operations the site shall be reinstated to its original state unless Al Dhafra elect to continue EPF operation An overall plan of the project site location is as shown below The proposed FFD pipeline is shown in green The existing QashwiraAsab pipeline is shown in blue and the proposed tanker road currently sand track is shown in black At Haliba Well area CTF Storage loading area Oil producer 12 numbers with associated wellhead facilities Flowlines from Wellhead to CTF Water injection system comprising of Aquifer Water Supply well 1 number Injection water surface pumps and injection wells 11 Numbers One Water Disposal Well Production and Test Manifolds Multiphase flow meter for Well Testing Crude Treatment Facility comprising of Mutli stage separators Heater Desalter Dehydrator Crude Stablization column as a minimum Storage tank pumps and allocation metering for loading operation for trucking option Export pump for pipeline option Loading arms for trucking option Produced water treatment facility if required Nitrogen package Instrument air package

قدِّم طلب ترشيحك
أضف الى المفضلات
إزالة من الإشارات المرجعية
قدِّم طلب ترشيحك
بريدي الالكتروني
بالنقر فوق "متابعة"، عطي نيوفو الموافقة على معالجة بياناتي وإرسال تنبيهات البريد الإلكتروني لي، وفقًا لسياسة الخصوصية الخاصة بنيوفو. يمكنني إلغاء اشتراكي أو سحب موافقتي في أي وقت.
واصل
استمارة الطلب